Print, Photographic
Photograph. Black and white photo showing press photographers and attendees at the "Partners in Progress" dedication ceremony for the two recently completed power interconnections between the Detroit Edison Company and Ontario Hydro. One interconnection was made across the Detroit River between the Detroit Edison Delray electric power plant and the Ontario Hydro J. C. Keith Generating Station in Windsor, Ontario. The other interconnection was made across the St. Clair River between the Detroit Edison Marysville electric power plant and Ontario Hydro transmission lines located just south of Sarnia, Ontario. The ceremony was held on December 18, 1953, at the Marysville power plant. A steel lattice transmission line tower and aerial power lines that are part of the Ontario Hydro interconnection across the St. Clair River can be seen in the center background area of the photo.