One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The two-level Continuous Annealing & Pickling (CAP) line is shown under construction. An unfinished, lower portion of the floor is visible in the foreground. On the finished concrete floor, two workers stand beside an open "Motor City Electric Co." tool cart. A second cart stands behind the workers. A wooden barricade stands in the foreground on the right. Beyond the barricade, piles of broken concrete and wood scraps can be seen. A concrete truck is visible in the far right background. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 1-2-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.