One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The two-level Continuous Annealing & Pickling (CAP) line is shown under construction. Fresh concrete is being delivered via a chute onto a section of floor and workers stand on rebar in this area. Rebar frames can be seen in the background where more workers are also visible. A tank stands in the foreground where various materials lie on the floor. The support beams of the CAP line can be seen in the background. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 1-30-75 CONSTRUCTION PROGRESS".
Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590