Digital Collection
2018.039.167

Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The entrance end of the two-level Continuous Annealing & Pickling (CAP) line is shown under construction. A "Taylor Winfield" welder stands to the right of a "Production Machinery" wash tank. A metal box stands in front of the wash tank and a wooden table stands in front of the welder. Several open tool carts stand to the right of the table. A catwalk can be seen overhead. Other parts and equipment can be seen in the background. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 2-13-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.

Request Image