Digital Collection
2018.039.128

Print, Photographic

One black and white photograph (and one copy) showing the interior of a two-story factory building at McLouth Steel Corporation. The exit end of the two-level Continuous Annealing & Pickling (CAP) line is shown. A recoiler can be seen in the foreground behind its unfinished jack pit. To the right is a second recoiler awaiting installation. The Production Machinery (PM) logo is visible on several machines. An elevated control panel is partially visible in the right background, as is the upper level of the CAP line. A gantry crane track is visible above the upper level. A black box with white text in the lower left corner reads "NO. 11 C.P. LINE DATE: 3-27-75 CONSTRUCTION PROGRESS".

Printed on the verso in black ink: Commercial Color Photography, 1024 Ford (Northline), Wyandotte, Michigan 48102 285-4590.