Drawing, Technical
Bracket and Chock for St'r. [Steamer] No. 66
One drawing entitled "Bracket and Chock for St'r. [Steamer] No. 66." The drawing consists of red and black ink on linen and shows plan, profile, and cross-section views of the chock assembly for the proposed vessel. The drawing is shown at a scale of 3 inches = 1 foot and is dated April 24, 1894. Handwritten cursive text beneath the title shows "Craig Ship Bldg. Co., Toledo." Handwritten text within a blue stamp in the lower right corner shows "New Drawing No. Tol. 66-S82-1-2, Tube No. 2."
Related Records
Drawing, Technical
2013.042.575Archive
Full Size Sketch of Composition Hinges for Freeing Ports,
Str. [Steamer] No. 66
Drawing, Technical
2013.042.578Archive
Str. [Steamer] No. 66,
Full Size Section of Stem Showing Rabbet.
Drawing, Technical
2013.042.591Archive
Plan and Elevation of Boiler Foundation,
Str. [Steamer] No. 66